The University of New South Wales

go to UNSW home page

Handbook Home

PRINT THIS PAGE
Drilling Fluids and Cementing - PTRL4024
 Petrol1.jpg

   
   
   
 
Campus: Kensington Campus
 
 
Career: Undergraduate
 
 
Units of Credit: 6
 
 
EFTSL: 0.12500 (more info)
 
 
Indicative Contact Hours per Week: 4
 
 
Enrolment Requirements:
 
 
Prerequisite:PTRL3003,PTRL3015
 
 
CSS Contribution Charge:Band 2 (more info)
 
   
 
Further Information: See Class Timetable
 
  

Description

The course comprises of Unit A and Unit B:
Unit A: Introduction to the basic functions and properties of drilling fluids and cement slurries. Composition and related properties of drilling fluids and cement slurries. Types of equipment and methods used in cementing operations. Drilling fluid and cement slurry hydraulics. Determination of torque and drag. Calculation of cutting transport efficiency. Placement technique of cements. Gas migration through cement columns.
Unit B involves simulation of drilling processes during drilling operation and study drilling and drilling fluid parameters in a Computer Simulation Laboratory: Selection of drillstring, making a connection and tripping out operation, effect of weight on bit and mud weight on rate of penetration, maintaining a constant mud weight during drilling fluid circulation and change of mud system at different hole sections.


URL for this page:

© The University of New South Wales (CRICOS Provider No.: 00098G), 2004-2011. The information contained in this Handbook is indicative only. While every effort is made to keep this information up-to-date, the University reserves the right to discontinue or vary arrangements, programs and courses at any time without notice and at its discretion. While the University will try to avoid or minimise any inconvenience, changes may also be made to programs, courses and staff after enrolment. The University may also set limits on the number of students in a course.