|
|
|
|
| |
|
| |
|
| |
|
Campus: Kensington Campus
| |
|
Career: Postgraduate
| |
|
Units of Credit: 6
| |
|
| |
|
Contact Hours per Week: 0
| |
|
Equivalent: CVEN9702
| |
|
| |
|
| |
|
|
|
Description
The planning process; time estimating; the link between planning and control; control systems; the critical path method, networks, resource levelling, resource constrained scheduling, network compression, overlapping relationships, applied cpm, cost influences, project control, legal considerations, simulation in networks, stochastic networks, project management, applications.
|